{
  "story_id": "efa72aa254ebb9a74983ed97590437c5",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-09-04T08:30:04.000Z",
  "content_hash": "859ffae616132b016242e500e81b43d26a29d773f3aa0718a5e664575213bfa3",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Rocket Lab's Neutron Hungry Hippo fairing completes testing ahead of 2026 launch",
    "dek": "Rocket Lab finished testing Neutron's Hungry Hippo fairing, nearing its planned 2026 debut launch.",
    "prose": "On 2026-08-27, Rocket Lab announced that the Hungry Hippo fairing section of its Neutron rocket completed all necessary testing before its first flight, including opening and closing of the halves in flight-like conditions. [^1]\n\nAmerican company Rocket Lab confirmed plans for the first test flight of its reusable Neutron rocket by the end of 2026. [^2]\n\nEarlier in August 2026, Rocket Lab reported that the Hungry Hippo fairing had received all required subystems, including thermal protection, control surfaces, and avionics. [^3]\n\nIn August 2026, Rocket Lab disclosed that its Archimedes engine had completed over 400 hot-fire tests, with control and durability confirmed across flight hardware for all major components. [^4]\n\nRocket Lab revealed that the first Archimedes engines for Neutron's debut flight are currently in production. [^5]\n\nRocket Lab recently completed integration tests for the 'Hungry Hippo' fairing and conducted hundreds of tests for the Archimedes engine. [^6]\n\nThe Neutron rocket's fairing is permanently attached to the first stage and deploys during flight, eliminating the need for a separate capture system. [^7]\n\nRocket Lab holds several satellite launch contracts with the Neutron rocket, including one with the U.S. Space Force. [^8]",
    "cited": "[{\"statement\":\"On 2026-08-27, Rocket Lab announced that the Hungry Hippo fairing section of its Neutron rocket completed all necessary testing before its first flight, including opening and closing of the halves in flight-like conditions.\",\"source\":\"NASASpaceFlight.com\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-02T21:06:05.000Z\",\"publisher_count\":1,\"sources\":[\"NASASpaceFlight.com\"]},{\"statement\":\"American company Rocket Lab confirmed plans for the first test flight of its reusable Neutron rocket by the end of 2026.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-04T08:30:04.000Z\",\"publisher_count\":1,\"sources\":[\"Lenta.ru\"]},{\"statement\":\"Earlier in August 2026, Rocket Lab reported that the Hungry Hippo fairing had received all required subystems, including thermal protection, control surfaces, and avionics.\",\"source\":\"NASASpaceFlight.com\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-02T21:06:05.000Z\",\"publisher_count\":1,\"sources\":[\"NASASpaceFlight.com\"]},{\"statement\":\"In August 2026, Rocket Lab disclosed that its Archimedes engine had completed over 400 hot-fire tests, with control and durability confirmed across flight hardware for all major components.\",\"source\":\"NASASpaceFlight.com\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-02T21:06:05.000Z\",\"publisher_count\":1,\"sources\":[\"NASASpaceFlight.com\"]},{\"statement\":\"Rocket Lab revealed that the first Archimedes engines for Neutron's debut flight are currently in production.\",\"source\":\"NASASpaceFlight.com\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-02T21:06:05.000Z\",\"publisher_count\":1,\"sources\":[\"NASASpaceFlight.com\"]},{\"statement\":\"Rocket Lab recently completed integration tests for the 'Hungry Hippo' fairing and conducted hundreds of tests for the Archimedes engine.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-04T08:30:04.000Z\",\"publisher_count\":1,\"sources\":[\"Lenta.ru\"]},{\"statement\":\"The Neutron rocket's fairing is permanently attached to the first stage and deploys during flight, eliminating the need for a separate capture system.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-04T08:30:04.000Z\",\"publisher_count\":1,\"sources\":[\"Lenta.ru\"]},{\"statement\":\"Rocket Lab holds several satellite launch contracts with the Neutron rocket, including one with the U.S. Space Force.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-04T08:30:04.000Z\",\"publisher_count\":1,\"sources\":[\"Lenta.ru\"]}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": null,
  "receipt_note": "this revision predates receipt-keeping (before v0.37.0); the filed row lives in the record",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "12fbbe9ff07a3bc4a90304b2b189c2b3",
      "thread_id": "b5d4cc833d64f100c3989094f8de2c87",
      "thread_label": "Hungry Hippo",
      "novelty": "UPDATE",
      "content_hash": "da55a15676afb427b120a26aae6b5865d42ae11a57be471045c381c14231045f",
      "last_published_at": "2026-09-04T08:30:04.000Z",
      "read_receipt": {
        "slice_hash": "be67d160e9696fd7d6e5f4dff9a5c2c0f38469ddeedc67a155763f7be39d8812",
        "cursor_from": "eyJ0cyI6IjIwMjYtMDktMDRUMDg6MDg6MDcuMDAwMDAwWiIsImlkIjoiZTMzMzJiODc0OWRlODc1MDVjMTAzNDc3NGY5N2E0NWYiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMDktMDRUMDk6MTM6NDguMDAwMDAwWiIsImlkIjoiMDU5ZDQ2MTFlMzRiYmU4YjY4NGQ3YjBmMTA2ZDZhZDgiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 11734244,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "bjEmz8A0zFuzjw2WwTrN1c5B7RtepfL2aAvy_8Qr99PNKMS2TX_qjYNIddn8WwSp2HOKTBQ203taP9k-g1ZdDw",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      }
    },
    "written_at": "2026-09-04T12:26:40.259Z"
  },
  "cited_facts": [
    {
      "statement": "On 2026-08-27, Rocket Lab announced that the Hungry Hippo fairing section of its Neutron rocket completed all necessary testing before its first flight, including opening and closing of the halves in flight-like conditions.",
      "source": "NASASpaceFlight.com",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-02T21:06:05.000Z",
      "publisher_count": 1,
      "sources": [
        "NASASpaceFlight.com"
      ]
    },
    {
      "statement": "American company Rocket Lab confirmed plans for the first test flight of its reusable Neutron rocket by the end of 2026.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-04T08:30:04.000Z",
      "publisher_count": 1,
      "sources": [
        "Lenta.ru"
      ]
    },
    {
      "statement": "Earlier in August 2026, Rocket Lab reported that the Hungry Hippo fairing had received all required subystems, including thermal protection, control surfaces, and avionics.",
      "source": "NASASpaceFlight.com",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-02T21:06:05.000Z",
      "publisher_count": 1,
      "sources": [
        "NASASpaceFlight.com"
      ]
    },
    {
      "statement": "In August 2026, Rocket Lab disclosed that its Archimedes engine had completed over 400 hot-fire tests, with control and durability confirmed across flight hardware for all major components.",
      "source": "NASASpaceFlight.com",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-02T21:06:05.000Z",
      "publisher_count": 1,
      "sources": [
        "NASASpaceFlight.com"
      ]
    },
    {
      "statement": "Rocket Lab revealed that the first Archimedes engines for Neutron's debut flight are currently in production.",
      "source": "NASASpaceFlight.com",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-02T21:06:05.000Z",
      "publisher_count": 1,
      "sources": [
        "NASASpaceFlight.com"
      ]
    },
    {
      "statement": "Rocket Lab recently completed integration tests for the 'Hungry Hippo' fairing and conducted hundreds of tests for the Archimedes engine.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-04T08:30:04.000Z",
      "publisher_count": 1,
      "sources": [
        "Lenta.ru"
      ]
    },
    {
      "statement": "The Neutron rocket's fairing is permanently attached to the first stage and deploys during flight, eliminating the need for a separate capture system.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-04T08:30:04.000Z",
      "publisher_count": 1,
      "sources": [
        "Lenta.ru"
      ]
    },
    {
      "statement": "Rocket Lab holds several satellite launch contracts with the Neutron rocket, including one with the U.S. Space Force.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "published_at": "2026-09-04T08:30:04.000Z",
      "publisher_count": 1,
      "sources": [
        "Lenta.ru"
      ]
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true."
}